This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
ttt:preparation_04 [2017/02/24 03:35] Andrei Maberley [Preparing Installers] |
ttt:preparation_04 [2017/11/10 06:54] (current) Andrei Maberley [Health And Safety] |
||
---|---|---|---|
Line 4: | Line 4: | ||
- | Before the workshops start, approach your partner organisation for help with identifying workshops participants with special needs and/or mobility issues. If you have more than one facilitator, | + | Before the workshops start, approach your partner organisation for help with identifying workshops participants with special needs and/or mobility issues. If you have more than one facilitator, |
==== ==== | ==== ==== | ||
- | For the first workshop, the priority is on physically moving, taking apart and rebuilding the PCs, there is no need for power in this workshop for the participants. | + | For the first workshop, the priority is on physically moving, taking apart and rebuilding the PCs, there is no need for power in this workshop for the participants. |
- | ==== Workshop 01 Pre-Flight Checklist (approx | + | ==== ==== |
+ | |||
+ | Remember to keep one PC for the facilitators to work on, and a second to keep untouched to refer to during the rebuilding sections. | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ==== Workshop 01 Pre-Flight Checklist (approx | ||
< | < | ||
- | < | + | < |
< | < | ||
Line 23: | Line 30: | ||
< | < | ||
- | < | + | < |
< | < | ||
- | |||
===== Workshop 02 ===== | ===== Workshop 02 ===== |